Thermal Engineering was engaged to provide a cooling solution for a crusher on a gold mine. A HM115 chiller was selected to provide the 115kW of cooling demand whilst installed in dry and dusty conditions with temperatures reaching towards 50C.
Thermal Engineering was able to provide commissioning support and has continued to work with the team on-site to provide technical support, training and maintenance for the chiller through our dedicated service team.